+201007038649 | 24/7 Support Sun - Thu: 9:00 - 17:00 Closed on Weekend
The project included the demolition of some existing elements, finishing works, engineering, electrical and mechanical works to improve the building design and utilize spaces effectively, by employing the latest technologies in designing spaces and improving air circulation and natural light. The program also includes advanced coordination works for fire and cooling systems and furniture to ensure maximum comfort and efficiency in the use of spaces. In addition, all facade works were implemented with high-quality, environmentally resistant materials, in the following areas: (Concrete – Buildings – Iron – Finishing – Sanitary – Fire – Electricity – Low current – Gardens – Facades), which ensures the desired architectural aesthetic and long-term durability. All these works are coordinated according to international standards to ensure the implementation of the development and upgrading project of the building in a comprehensive and sustainable manner.